DTE Demo DogDEMOLITION · LEHI UT Pull a permit
DTE DEMO D / Operations

How a permit
is posted.

Five lifts from permit to close — the same method whether the lot is a wall or a building.

LIFTS 01–05

The board
run.

Each lift produces a record — that's how permits stay posted, not just open.

LFT·1File

Permit filed

The client states the lot and the scope; the office answers with a written permit — lot, scope and timeline named before wrecking.

LFT·2Tag

Lot tagged

The lot posts on the board — scope and timeline marked, the permit updated before the wreck runs.

LFT·3Run

Wreck runs

The work runs under the permit — lines filed, surfaces laid, status reported, everything posted to the same board.

LFT·4Issue

Client issued

The client receives the wreck — surfaces and status reported on a set cadence, not on request.

LFT·5Close

Permit closed

The permit closes with the board reconciled — lot, wreck and sign-off handed over and kept for reference.

DOCTRINE

Rules the board
posts by.

Doc · 01

Permitted first

No wreck before the permit — a written notice in place of a handshake.

Permitted first
Doc · 02

Board over memory

Lots and wrecks live on the board — the record, not recall, is the truth.

Tagged record
Doc · 03

Posted entry

Lots and scopes checked before wrecking — the permit stays open only if it's posted.

Posted entry
Doc · 04

Site-safe

Records and permits handled under the office's terms — segregated, disclosed only as required.

Secured site
Doc · 05

Permit handed over

Lot, wreck and sign-off go to the client at close — the record is theirs.

Client-owned
Doc · 06

Scope is plain

What's wrecked and what's not is stated on the permit — exclusions named, not assumed.

Plain scope
INQUIRIES

Asked at
the office.

Describe the lot and the scope — the office answers with a written permit including lot, scope and timeline. Nothing wrecks without the permit on file.

Both run on the same board — demolition posts under one lot, paving under another. The permit names which lot.

A written deliverable — lot tagged, lines filed, surface stated with the wreck named. It goes on the same board as the rest.

Frequently — a site that needs both demolition and paving touches two lots. The permit names the lots and the job runs as one board.

Pull the permit,
on the board.

Describe the lot, the scope and the timeline — the office answers with a written permit.

Pull a permit